What to Expect
STEP 1
Initial Consultation & Order Acceptance
• Discovery Call or Meeting: Define your production goals and automation requirements.
• Site Assessment: Optional onsite evaluation for precise planning.
• Custom Proposal: Includes tailored solution, pricing, and equipment selection.
• Order Confirmation: Lock in scope, deliverables, and financing terms.
• Site Assessment: Optional onsite evaluation for precise planning.
• Custom Proposal: Includes tailored solution, pricing, and equipment selection.
• Order Confirmation: Lock in scope, deliverables, and financing terms.
STEP 1
STEP 2
Project Planning
• Assigned Project Manager: Your dedicated point of contact. Included with every purchase.
• Vendor Management: One-point contact for all vendor coordination.
• Project Timeline: Shared with defined milestones by your dedicated project manager.
• Optional CAD Layouts: For individual machines or full-line setups.
• No False Promises: We don’t guarantee delivery dates—but we ensure transparent, real-time progress.
• Vendor Management: One-point contact for all vendor coordination.
• Project Timeline: Shared with defined milestones by your dedicated project manager.
• Optional CAD Layouts: For individual machines or full-line setups.
• No False Promises: We don’t guarantee delivery dates—but we ensure transparent, real-time progress.
STEP 2
STEP 3
Equipment Fabrication & Pre-Shipping
• Fabrication Commencement: Your deposit and drawing approvals kick off your equipment fabrication and lead times.
• Factory Acceptance Testing: Your product is tested with your new machine prior to shipping.
• Pre-Assembly: Systems are pre-assembled whenever possible, facilitating a smooth installation and commissioning.
• Factory Acceptance Testing: Your product is tested with your new machine prior to shipping.
• Pre-Assembly: Systems are pre-assembled whenever possible, facilitating a smooth installation and commissioning.
STEP 3
STEP 4
Shipping, Site Prep
• Coordinated Logistics: All handled by Chandler Automation to align with your schedule.
✅Site Prep Checklist: Before we can schedule your installation, the following must be completed:
✅Site Prep Checklist: Before we can schedule your installation, the following must be completed:
- Equipment uncrated & inspected
- Equipment in final position (per CAD layout)
- Forklift on site
- Machine leveled & stable
- Air & power supply installed and ready
- Internet connection to machine (if required)
- Dedicated power circuit (properly grounded)
- Product available for testing/training (as per sample)
- Containers available for testing/training (as per sample)
STEP 4
STEP 5
Installation & Commissioning, Startup, Programming & Training
• Expert Installation (if selected with order): Assemble and install equipment components according to the layout. Integrate equipment with existing systems as needed.
• Commissioning (if selected with order): Calibrated with your actual products. Test the installed equipment to ensure it performs to specification. Conduct fine-tuning and calibrations for optimal performance. Address any immediate adjustments or issues.
.• Programming: (if selected with order) Systems tuned for performance and efficiency. Ensure all systems meet safety, quality, and production standards.
• Training (if selected with order): On-site or virtual, including bilingual support.
• Handover & Support: Transition equipment control to your team. Provide useful manuals, SOPs, parts lists, and guides when available. Enroll in service membership programs for ongoing preventive maintenance and support if desired (Bronze to Diamond levels).
• Commissioning (if selected with order): Calibrated with your actual products. Test the installed equipment to ensure it performs to specification. Conduct fine-tuning and calibrations for optimal performance. Address any immediate adjustments or issues.
.• Programming: (if selected with order) Systems tuned for performance and efficiency. Ensure all systems meet safety, quality, and production standards.
• Training (if selected with order): On-site or virtual, including bilingual support.
• Handover & Support: Transition equipment control to your team. Provide useful manuals, SOPs, parts lists, and guides when available. Enroll in service membership programs for ongoing preventive maintenance and support if desired (Bronze to Diamond levels).
STEP 5
STEP 6
Post-Installation Support & Service Memberships
• Support & Service Memberships:
• Transparent Monthly Billing: No hidden travel or zone fees.
• Exclusive Benefits: Priority scheduling, Membership discounts, On-site or virtual options to meet your operational needs.
Learn More About > Service Membership
- Bronze: Quarterly (4 visits/year)
- Silver: Bi-Monthly (6 visits/year)
- Gold: Monthly (12 visits/year)
- Platinum: Twice Monthly (24 visits/year)
- Diamond: Weekly (52 visits/year)
• Transparent Monthly Billing: No hidden travel or zone fees.
• Exclusive Benefits: Priority scheduling, Membership discounts, On-site or virtual options to meet your operational needs.
Learn More About > Service Membership
STEP 6